Northern line





























































Northern line
Northern line flag box.svg

1995 stock at West Finchley.JPG
A Northern line train at West Finchley

Overview
Type Deep-tube
System London Underground
Stations 50
Ridership 252.310 million passenger journeys (2011/12)[1]
Colour on map
Black
Website tfl.gov.uk
Operation
Opened 1890
Depot(s) Golders Green, Morden; sidings at Edgware, Colindale, Hampstead, Chalk Farm, High Barnet, East Finchley, Archway, Camden Town, Euston (Bank branch), Moorgate, Charing Cross, Kennington, Tooting Broadway[2]
Rolling stock 1995 Stock
Technical
Line length 58 km (36 mi)
Track gauge
1,435 mm (4 ft 8 12 in)
Operating speed 45 mph (72 km/h)




Transport for London rail lines





















London Underground

Bakerloo

Central

Circle

District

Hammersmith & City

Jubilee

Metropolitan

Northern

Piccadilly

Victoria

Waterloo & City

Other lines

Docklands Light Railway

Tramlink

Overground

TfL Rail




The Northern line is a London Underground line that runs from south-west to north-west London, with two branches through central London and three in the north. It runs northwards from its southern terminus at Morden in the borough of Merton to Kennington in Southwark, where it divides into two central branches, one via Charing Cross in the West End and the other via Bank in the City. The central branches re-join at Camden Town where the line again divides into two branches, one to High Barnet and the other to Edgware in the borough of Barnet. On the High Barnet branch there is a short single-track branch to Mill Hill East only.


For most of its length it is a deep-level tube line.[nb 1] The portion between Stockwell and Borough opened in 1890 and is the oldest section of deep-level tube line on the Underground network. There were about 294 million passenger journeys recorded in 2016/17 on the Northern line, making it the busiest on the Underground.[3] It is unique in having two different routes through central London. Despite its name, it does not serve the northernmost stations on the network, though it does serve the southernmost station, Morden, as well as 16 of the system's 29 stations south of the River Thames. There are 50 stations in total on the line, of which 36 have platforms below ground.


The line has a complicated history, and the current complex arrangement of two main northern branches, two central branches and the southern route reflects its genesis as three separate railways, combined in the 1920s and 1930s. An extension in the 1920s used a route originally planned by a fourth company. Abandoned plans from the 1920s to extend the line further southwards, and then northwards in the 1930s, would have incorporated parts of the routes of two further companies. From the 1930s to the 1970s, the tracks of a seventh company were also managed as a branch of the Northern line.[nb 2] An extension from Kennington to Battersea is currently under construction, which may either give the Northern line a second southern branch or may see it split into separate distinct lines with their own identities. It is coloured black on the current Tube map.




Contents






  • 1 History


    • 1.1 Formation


    • 1.2 Integration


    • 1.3 Extensions


      • 1.3.1 Edgware Extension


      • 1.3.2 Morden Extension




    • 1.4 Naming


    • 1.5 Great Northern & City Railway


    • 1.6 Northern Heights plan


      • 1.6.1 Intended service levels


      • 1.6.2 Progress of works






  • 2 Recent developments


    • 2.1 24-hour weekend service




  • 3 Services


    • 3.1 Peak


    • 3.2 Off-peak


    • 3.3 Night




  • 4 Map


  • 5 Stations


    • 5.1 Open stations


    • 5.2 Closed stations


      • 5.2.1 Permanently closed stations


      • 5.2.2 Resited stations


      • 5.2.3 Abandoned plans






  • 6 Infrastructure


    • 6.1 Rolling stock


    • 6.2 Tunnels


    • 6.3 Depots




  • 7 Future


    • 7.1 Battersea extension


    • 7.2 Northern line split




  • 8 In popular culture


  • 9 See also


  • 10 Maps


  • 11 References


    • 11.1 Notes


    • 11.2 Citations


    • 11.3 Bibliography




  • 12 External links





History



Formation


See City and South London Railway and Charing Cross, Euston and Hampstead Railway for detailed histories of these companies



City & South London Railway train, 1890


The core of the Northern line evolved from two railway companies: the City & South London Railway (C&SLR) and the Charing Cross, Euston & Hampstead Railway (CCE&HR).


The C&SLR, London's first deep-level tube railway, was built under the supervision of James Henry Greathead, who had been responsible, with Peter W. Barlow, for the Tower Subway. It was the first of the Underground's lines to be constructed by boring deep below the surface and the first to be operated by electric traction. The railway opened in November 1890 from Stockwell to a now-disused station at King William Street. This was inconveniently placed and unable to cope with the company's traffic so, in 1900, a new route to Moorgate via Bank was opened. By 1907 the C&SLR had been further extended at both ends to run from Clapham Common to Euston.



Formation of the Northern line (Northern Heights extensions not shown)


The CCE&HR (commonly known as the "Hampstead Tube") was opened in 1907 and ran from Charing Cross (known for many years as Strand) via Euston and Camden Town (where there was a junction) to Golders Green and Highgate (now known as Archway). It was extended south by one stop to Embankment in 1914 to form an interchange with the Bakerloo and District lines. In 1913 the Underground Electric Railways Company of London (UERL), owner of the CCE&HR, took over the C&SLR, although they remained separate companies.



Integration


During the early 1920s, a series of works was carried out to connect the C&SLR and CCE&HR tunnels to enable an integrated service to be operated. The first of these new tunnels, between the C&SLR's Euston station and the CCE&HR's station at Camden Town, had originally been planned in 1912[4] but had been delayed by World War I. The second connection linked the CCE&HR's Embankment and C&SLR's Kennington stations and provided a new intermediate station at Waterloo to connect to the main line station there and the Bakerloo line. The smaller-diameter tunnels of the C&SLR were expanded to match the standard diameter of the CCE&HR and the other deep tube lines.



Extensions


In conjunction with the works to integrate the two lines, two major extensions were undertaken: northwards to Edgware in Middlesex (now in the London Borough of Barnet) and southwards to Morden in Surrey (then in the Merton and Morden Urban District, but now in the London Borough of Merton).



Edgware Extension


The Edgware extension used plans dating back to 1901 for the Edgware and Hampstead Railway (E&HR)[5] which the UERL had taken over in 1912. It extended the CCE&HR line from its terminus at Golders Green to Edgware in two stages: to Hendon Central in 1923 and to Edgware in 1924. The line crossed open countryside and ran on the surface, apart from a short tunnel north of Hendon Central. Five new stations were built to pavilion-style designs by Stanley Heaps, head of the Underground's Architects Office, stimulating the rapid northward expansion of suburban developments in the following years.



Morden Extension


The engineering of the Morden extension of the C&SLR from Clapham Common to Morden was more demanding, running in tunnels to a point just north of Morden station, which was constructed in a cutting. The line then runs under the wide station forecourt and public road outside the station, to the depot. The extension was initially planned to continue to Sutton[6] over part of the route for the unbuilt Wimbledon and Sutton Railway, in which the UERL held a stake, but agreements were made with the Southern Railway to end the extension at Morden. The Southern Railway later built the surface line from Wimbledon to Sutton, via South Merton and St. Helier.[nb 3] The tube extension opened in 1926, with seven new stations, all designed by Charles Holden in a modern style. Originally, Stanley Heaps was to design the stations, but after seeing these designs Frank Pick, Assistant Joint Manager of the UERL, decided Holden should take over the project.[7]


With the exception of Morden and Clapham South, where more land was available, the new stations were built on confined corner sites at main road junctions in areas that had been already developed. Holden made good use of this limited space and designed impressive buildings. The street-level structures are of white Portland stone with tall double-height ticket halls, with the famous London Underground roundel made up in coloured glass panels in large glazed screens. The stone columns framing the glass screens are surmounted by a capital formed as a three-dimensional version of the roundel. The large expanses of glass above the entrances ensure that the ticket halls are bright and, lit from within at night, welcoming.[8] The first and last new stations on the extension, Clapham South and Morden, include a parade of shops and were designed with structures capable of being built above (like many of the earlier central London stations). Clapham South was extended upwards soon after its construction with a block of apartments; Morden was extended upwards in the 1960s with a block of offices. All the stations on the extension, except Morden itself, are Grade II listed buildings.



Naming


The resulting line became known as the Morden–Edgware line, although a number of alternative names were also mooted in the fashion of the contraction of Baker Street & Waterloo Railway to "Bakerloo", such as "Edgmor", "Mordenware", "Medgway" and "Edgmorden".[9] With Egyptology very much in fashion after the discovery of the tomb of Tutankhamun in 1922, there was also a proposal to call the line the Tootancamden Line as it passed through both Tooting and Camden.[10] It was eventually named the Northern line from 28 August 1937,[11] reflecting the planned addition of the Northern Heights lines.[12]



Great Northern & City Railway


After the UERL and the Metropolitan Railway (MR) were brought under public control in the form of the London Passenger Transport Board (LPTB) in 1933, the MR's subsidiary, the Great Northern & City Railway, which ran from Moorgate to Finsbury Park, became part of the Underground as the Northern City Line. In preparation for the Northern Heights Plan, it was operated as part of the Northern line, although it was never connected to it.



Northern Heights plan




Sign displaying the route of the Northern Heights extension



See Edgware, Highgate and London Railway for a detailed history of the company.

In June 1935, the LPTB announced the New Works Programme, an ambitious plan to expand the Underground network which included the integration of a complex of existing London and North Eastern Railway (LNER) lines north of Highgate through the Northern Heights. These lines, built in the 1860s and 1870s by the Edgware, Highgate and London Railway (EH&LR) and its successors, ran from Finsbury Park to Edgware via Highgate, with branches to Alexandra Palace and High Barnet. The line taken over would be extended beyond Edgware to Brockley Hill, Elstree South and Bushey Heath with a new depot at Aldenham. The extension's route was that planned for the unbuilt Watford and Edgware Railway (W&ER), using rights obtained from the earlier purchase of the W&ER (which had long intended an extension of the EH&LR Edgware route towards Watford). This also provided the potential for further extension in the future; Bushey's town planners reserved space in Bushey village for a future station and Bushey Heath station's design was revised several times to ensure this option would remain available in the future.


The project involved electrification of the surface lines (operated by steam trains at the time), the doubling of the original single-line section between Finchley Central and the proposed junction with the Edgware branch of the Northern line, and the construction of three new linking sections of track: a connection between Northern City Line and Finsbury Park station on the surface; an extension from Archway to the LNER line near East Finchley via new deep-level platforms below Highgate station; and a short diversion from just before the LNER's Edgware station to the Underground's station of the same name.



Intended service levels


The peak-hour service pattern was to be 21 trains an hour each way on the High Barnet branch north of Camden Town, 14 of them via the Charing Cross branch and seven via the Bank branch. 14 would have continued on beyond Finchley Central, seven each on the High Barnet and Edgware branches. An additional seven trains an hour would have served the High Barnet branch, but continued via Highgate High-Level and Finsbury Park to Moorgate, a slightly shorter route to the City. It does not seem to have been intended to run through trains to the ex-Northern City branch from Edgware via Finchley Central. Seven trains an hour would have served the Alexandra Palace branch, to/from Moorgate via Highgate High-Level. In addition to the 14 through trains described, the ex-Northern City branch would have had 14 four-car shuttle trains an hour.



Progress of works


Work began in the late 1930s, and was in progress on all fronts by the outbreak of World War II. The tunnelling northwards from the original Highgate station (now Archway) had been completed, and the service to the rebuilt surface station at East Finchley started on 3 July 1939, but without the opening of the intermediate (new) Highgate Station, at the site of the LNER's station of the same name. Further progress was disrupted by the start of the war, though enough had been made to complete the electrification of the High Barnet branch onwards from East Finchley over which tube services started on 14 April 1940; the new (deep-level) Highgate station opened on 19 January 1941. The single track LNER line to Edgware was electrified as far as Mill Hill East, including the Dollis Brook Viaduct, opening as a tube service on 18 May 1941 to serve the barracks there, thus forming the Northern line as it is today. The new depot at Aldenham had already been built and was used to build Halifax bombers. Work on the other elements of the plan was suspended late in 1939.


Work on the extension from Edgware to Bushey Heath including work on a viaduct and a tunnel started in June 1939, but was stopped after war broke-out.[13] After the war, the area beyond Edgware was made part of the Metropolitan Green Belt, largely preventing the anticipated residential development in the area, and the potential demand for services from Bushey Heath thus vanished. Passenger numbers also dropped on the then-BR's Mill Hill and Alexandra Palace branches, so it was useless to electrify them. Available funds were directed towards completing the eastern extension of the Central line instead, and the Northern Heights plan was dropped on 9 February 1954. Aldenham depot was converted into an overhaul facility for buses.




Close-up of 1995 Stock cab


The implemented service from High Barnet branch gave good access both to the West End and the City. This appears to have undermined traffic on the Alexandra Palace branch, still run with steam haulage to Kings Cross via Finsbury Park, as Highgate (low-level) was but a short bus ride away and car traffic was much lighter than it would become later. Consequently, the line from Finsbury Park to Muswell Hill and Alexandra Palace via the surface platforms at Highgate was closed altogether to passenger traffic in 1954. This contrasts with the decision to electrify the Epping-Ongar branch of the Central line, another remnant of the New Works programme, run as a tube-train shuttle from 1957. A local pressure group, the Muswell Hill Metro Group, campaigns to reopen this route as a light-rail service. So far there is no sign of movement on this issue: the route, now the Parkland Walk, is highly valued by walkers and cyclists, and suggestions in the 1990s that it could, in part, become a road were met with fierce opposition. Another pressure group has proposed using the track bed further north, as part of the North and West London Light Railway. The connection between Drayton Park and the surface platforms at Finsbury Park was opened in 1976, when the Northern City Line became part of British Rail.



Recent developments


In 1975, the Northern City Line, known by that time as the Highbury branch, was transferred from London Underground to British Rail; it is now served by Great Northern. In the past, before the introduction of the 1995 stock, the Northern line was sometimes nicknamed the "Misery Line" in the press because of its perceived unreliability.[14][15]


In 2003, a train derailed at Camden Town. Although no one was hurt, points, signals and carriages were damaged, and the junctions there were not used while repairs were under way: trains coming from Edgware worked the Bank branch only, and trains from High Barnet and Mill Hill East worked the Charing Cross branch only. This situation was resolved when the junctions reopened, after much repair work and safety analysis and testing by contractor, on 7 March 2004.
A joint report by the Underground and its maintenance contractor Tube Lines concluded that poor track geometry was the main cause, and that, because of this, extra friction arising out of striations (scratches) on a newly installed set of points had allowed the leading wheel of the last carriage to climb the rail and so derail. The track geometry at the derailment site is a very tight bend and tight tunnel bore, which precludes the normal solution for this sort of geometry of canting the track by raising the height of one rail relative to the other.


On 7 July 2005 a defective train on the Northern line (causing its subsequent suspension) saved a Northern line train from being blown up as part of a terrorist attack on the London Underground and bus systems. Three trains on the Circle and Piccadilly lines were blown up. The Northern line bomber-to-be instead boarded a bus, which he later blew up.


On 13 October 2005 the Northern line service was suspended due to maintenance problems with the emergency braking system on the entire train fleet.[16] A series of rail replacement buses was used to connect outlying stations with other Underground lines.[17] Full service was restored on 18 October.


From June 2006, the service between East Finchley and Camden Town was suspended for two non-consecutive weekends every month, with service on the Edgware branch suspended for the other two weeks. This was part of Tube Lines's redevelopment of some Edgware and High Barnet Branch stations, including replacement of track, signals, as well as station maintenance.[18] This included refurbishment of all High Barnet branch stations from West Finchley to Camden Town. In October 2006, off-peak service between Mill Hill East and Finchley Central was cut back to a shuttle, except for a few weekend through trains.


On 13 August 2010, a defective rail grinding train caused disruption on the Charing Cross branch, after it travelled four miles in 13 minutes without a driver. The train was being towed to the depot after becoming faulty. At Archway station, the defective train became detached and ran driverless until coming to a stop at an incline near Warren Street station. This caused morning rush-hour services to be suspended on this branch. All passenger trains were diverted via the Bank branch, with several not stopping at stations until they were safely on the Bank branch.[19][20]


The Northern line was originally scheduled to switch to automatic train operation in 2012, using the same SelTrac S40 system[21] as used since 2009 on the Jubilee line and for a number of years on the Docklands Light Railway.[22] Originally the work was to follow on from the Jubilee line so as to benefit from the experience of installing it there, but that project was not completed until spring 2011. Work on the Northern line was contracted to be completed before the 2012 Olympics. It is now being undertaken in-house, and TfL predicted the upgrade would be complete by the end of 2014.[23] The first section of the line (West Finchley to High Barnet) was transferred to the new signalling system on 26 February 2013[24] and the line became fully automated on 1 June 2014 with the Chalk Farm to Edgware via Golders Green section being the last part of the line to switch to ATO.[citation needed]


In January 2018, Transport for London announced that it would double the period during which it runs peak evening services in the central London section to tackle overcrowding. There would now be 24 trains an hour on both central London branches of the Northern Line, as well as 30 trains an hour on the Kennington to Morden section between 5pm and 7pm.[3]



24-hour weekend service


Since the autumn of 2016[25] a 24-hour "Night Tube" service runs on Friday and Saturday nights from Edgware and High Barnet to Morden via Charing Cross; other sections of the line do not operate the 24-hour service.[26] One train runs every 8 minutes between Morden and Camden Town and a train every 15/16 minutes between Camden Town and Edgware/High Barnet. Labour disputes delayed the planned start date of September 2015.[27]



Services



Peak


As of 2015, morning peak southbound services are:[28]



  • 10 tph from Edgware to Kennington via Charing Cross

  • 2 tph from Edgware to Morden via Charing Cross

  • 12 tph from Edgware to Morden via Bank

  • 10 tph from High Barnet to Kennington via Charing Cross

  • 2 tph from High Barnet to Morden via Charing Cross

  • 12 tph from High Barnet to Morden via Bank

  • 4 tph from Mill Hill East to Finchley Central


This gives 24 tph service on all parts of the Northern Line except between Kennington and Morden, and between Finchley Central and Mill Hill East, where services run at 28 tph.



Off-peak


As of 2015, off-peak services are:[28]



  • 10 tph from Edgware to Kennington via Charing Cross

  • 10 tph from Edgware to Morden via Bank

  • 10 tph from High Barnet to Kennington via Charing Cross

  • 10 tph from High Barnet to Morden via Bank

  • 4 tph from Mill Hill East to Finchley Central


This gives a 20 tph service on all parts of the Northern line except between Mill Hill East and Finchley Central.



Night


Since 2016, the Northern line has operated a Night Tube service on Friday and Saturday nights between Morden and Edgware/High Barnet. Trains run every 15 minutes giving:[25]



  • 8tph from Morden to Camden Town via Charing Cross

  • 4tph from Camden Town to Edgware

  • 4tph from Camden Town to High Barnet


No trains run on the Mill Hill East or Bank branches.



Map


Geographical path of the Northern line


Stations


.mw-parser-output .RMbox{box-shadow:0 2px 2px 0 rgba(0,0,0,.14),0 1px 5px 0 rgba(0,0,0,.12),0 3px 1px -2px rgba(0,0,0,.2)}.mw-parser-output .RMinline{float:none;width:100%;margin:0;border:none}.mw-parser-output table.routemap{padding:0;border:0;border-spacing:0;background:transparent;white-space:nowrap;line-height:1.2;margin:auto}.mw-parser-output .RMir{border:0;border-spacing:0;display:table;line-height:0;padding:0!important;margin:0 auto!important}.mw-parser-output table.routemap .RMsi{display:inline;font-size:90%}.mw-parser-output table.routemap .RMl1{padding:0 3px;text-align:left}.mw-parser-output table.routemap .RMr1{padding:0 3px;text-align:right}.mw-parser-output table.routemap .RMl{text-align:right}.mw-parser-output table.routemap .RMr{text-align:left}.mw-parser-output table.routemap .RMl4{padding:0 3px 0 0;text-align:left}.mw-parser-output table.routemap .RMr4{padding:0 0 0 3px;text-align:right}.mw-parser-output table.routemap>tbody>tr{line-height:1}.mw-parser-output table.routemap>tbody>tr>td{padding:0;width:auto;vertical-align:middle;text-align:center}.mw-parser-output .RMir>tbody>tr{display:inline-table}.mw-parser-output .RMir>tbody>tr>td{padding:0;height:20px;min-height:20px}.mw-parser-output .RMir .RMov{position:relative}.mw-parser-output .RMir .RMic{position:absolute;left:0px;top:0px;padding:0}.mw-parser-output .RMir .RMtx{line-height:20px;vertical-align:middle;text-align:center}.mw-parser-output .RMir .RMsp{height:20px;min-height:20px}.mw-parser-output .RMir div>.RMtx{position:absolute}.mw-parser-output .RMir .RMtx>abbr,.mw-parser-output .RMir .RMtx>div{line-height:.975;display:inline-block;vertical-align:middle}.mw-parser-output .RMir .RMf_{height:5px;min-height:5px;width:20px;min-width:20px}.mw-parser-output .RMir .RMfm{height:100%;min-height:100%;width:4px;min-width:4px;margin:0 auto}.mw-parser-output .RMir .RMo{width:2.5px;min-width:2.5px}.mw-parser-output .RMir .RMc{width:5px;min-width:5px}.mw-parser-output .RMir .RMoc{width:7.5px;min-width:7.5px}.mw-parser-output .RMir .RMd{width:10px;min-width:10px}.mw-parser-output .RMir .RMod{width:12.5px;min-width:12.5px}.mw-parser-output .RMir .RMcd{width:15px;min-width:15px}.mw-parser-output .RMir .RMocd{width:17.5px;min-width:17.5px}.mw-parser-output .RMir .RM_{width:20px;min-width:20px}.mw-parser-output .RMir .RM_o{width:22.5px;min-width:22.5px}.mw-parser-output .RMir .RM_c{width:25px;min-width:25px}.mw-parser-output .RMir .RM_oc{width:27.5px;min-width:27.5px}.mw-parser-output .RMir .RM_d{width:30px;min-width:30px}.mw-parser-output .RMir .RM_od{width:32.5px;min-width:32.5px}.mw-parser-output .RMir .RM_cd{width:35px;min-width:35px}.mw-parser-output .RMir .RM_ocd{width:37.5px;min-width:37.5px}.mw-parser-output .RMir .RMb{width:40px;min-width:40px}.mw-parser-output .RMir .RMcb{width:45px;min-width:45px}.mw-parser-output .RMir .RMdb{width:50px;min-width:50px}.mw-parser-output .RMir .RMcdb{width:55px;min-width:55px}.mw-parser-output .RMir .RM_b{width:60px;min-width:60px}.mw-parser-output .RMir .RM_cb{width:65px;min-width:65px}.mw-parser-output .RMir .RM_db{width:70px;min-width:70px}.mw-parser-output .RMir .RM_cdb{width:75px;min-width:75px}.mw-parser-output .RMir .RMs{width:80px;min-width:80px}.mw-parser-output .RMir .RMds{width:90px;min-width:90px}.mw-parser-output .RMir .RM_s{width:100px;min-width:100px}.mw-parser-output .RMir .RM_ds{width:110px;min-width:110px}.mw-parser-output .RMir .RMbs{width:120px;min-width:120px}.mw-parser-output .RMir .RMdbs{width:130px;min-width:130px}.mw-parser-output .RMir .RM_bs{width:140px;min-width:140px}.mw-parser-output .RMir .RM_dbs{width:150px;min-width:150px}.mw-parser-output .RMir .RMw{width:160px;min-width:160px}.mw-parser-output .RMir .RM_w{width:180px;min-width:180px}.mw-parser-output .RMir .RMbw{width:200px;min-width:200px}.mw-parser-output .RMir .RM_bw{width:220px;min-width:220px}.mw-parser-output .RMir .RMsw{width:240px;min-width:240px}.mw-parser-output .RMir .RM_sw{width:260px;min-width:260px}.mw-parser-output .RMir .RMbsw{width:280px;min-width:280px}.mw-parser-output .RMir .RM_bsw{width:300px;min-width:300px}






Northern line


Legend























































































































































































































































































































































































































































































































Bushey Heath
















aborted Bushey
Heath extension


Aldenham Works













Elstree South












Brockley Hill










Edgware












High Barnet

Edgware depot
























High Barnet sidings


Edgware (LNER)
























unbuilt link


















Totteridge & Whetstone



former LNER
to Mill Hill East















Woodside Park

Burnt Oak










West Finchley

Colindale
















Mill Hill

Mill Hill East










Alexandra Palace

Hendon Central










Dollis Brook Viaduct


Finchley Central










Muswell Hill

Brent Cross










St. James' Viaduct


East Finchley











Cranley Gardens

Golders Green
















LNER Alexandra
Palace branch


Golders Green depot














Highgate depot



















North End











Highgate north tunnel



















Highgate

Hampstead











Highgate south tunnel













Archway

Belsize Park











Tufnell Park












Kentish Town National Rail

Chalk Farm










South Kentish Town











Crouch End

Camden Town










Stroud Green

enlarge…













East Coast Main Line


Mornington Crescent
















Finsbury Park National RailPiccadilly LineVictoria Line




















Northern City Line


National RailVictoria LineLondon Overground Euston

















Drayton Park National Rail

















Highbury and Islington National RailVictoria LineLondon Overground

Victoria Line Warren Street










Essex Road National Rail












King's Cross St. Pancras

National RailCircle line (London Underground)Hammersmith & City LineMetropolitan LinePiccadilly LineVictoria Line


Goodge Street











Angel












City Road

Central line (London Underground) Tottenham Court Road

















Old Street National Rail


















Moorgate National RailCircle line (London Underground)Hammersmith & City LineMetropolitan Line

Piccadilly Line Leicester Square











Lothbury













Bank Central line (London Underground)Waterloo & City LineDocklands Light Railway

National RailBakerloo Line Charing Cross










King William Street


















River Thames


Bakerloo LineCircle line (London Underground)District LineLondon River Services Embankment


























London Bridge National RailJubilee LineLondon River Services



reversing loop
removed 1926





































Borough

National RailBakerloo LineJubilee LineWaterloo & City LineLondon River Services Waterloo












Elephant & Castle National RailBakerloo Line























Kennington

reversing loop



















under
construction






















Nine Elms














Oval

Battersea Power Station













Stockwell depot







Stockwell Victoria Line






Clapham North






Clapham Common






Clapham South






Balham National Rail






Tooting Bec






Tooting Broadway






Colliers Wood






South Wimbledon









Morden




proposed continuation to Sutton
unbuilt section












Morden depot


to Wimbledon












South Morden






Sutton Common






Cheam






Sutton






to Mitcham Junction

















Notice explaining about step-free access. This can be found inside every Northern line train.



Open stations








































































































































































































































































































































































Station Image Opened Branch Additional information

High Barnet Handicapped/disabled access
High Barnet stn entrance.JPG 1 April 1872 High Barnet Branch
Terminus. Northern line introduced 14 April 1940map 1
Totteridge & Whetstone Totteridge & Whetstone stn building.JPG 1 April 1872 High Barnet Branch Northern line introduced 14 April 1940 map 2

Woodside Park Handicapped/disabled access
Woodside Park stn building.JPG 1 April 1872 High Barnet Branch Northern line introduced 14 April 1940map 3

West Finchley Handicapped/disabled access
West Finchley stn entrance.JPG 1 March 1933 High Barnet Branch Northern line introduced 14 April 1940map 4

Mill Hill East (shuttle trains to and from Finchley Central)
Mill Hill East stn building.JPG 22 August 1867 Mill Hill Branch Closed 11 September 1939, reopened 18 May 1941map 5

Finchley Central Handicapped/disabled access
Finchley Central station.jpg 22 August 1867 High Barnet branch First Northern line train was 14 April 1940map 6
East Finchley East Finchley stn building.JPG 22 August 1867 High Barnet Branch First Northern line train was 3 July 1939map 7
Highgate Highgate station entrance Priory.JPG 22 August 1867 High Barnet Branch First Northern line train was 19 January 1941map 8
Archway Archway station side entrance.JPG 22 June 1907 High Barnet Branch Originally named Highgatemap 9
Tufnell Park Tufnell Park stn building.JPG 22 June 1907 High Barnet Branch map 10

Kentish Town National Rail
Kentish Town stn building.JPG 1868 High Barnet Branch First underground station opened on 22 June 1907. map 11

Edgware Handicapped/disabled access
Edgware station building.JPG 18 August 1924 Edgware Branch
Terminusmap 12
Burnt Oak Burnt Oak stn building.JPG 27 October 1924 Edgware Branch Opened with its current name, then renamed approximately 4 years after its opening and was reverted to its original name in 1950.map 13
Colindale Colindale station entrance.JPG 18 August 1924 Edgware Branch Used as a terminus for some trains travelling northmap 14

Hendon Central Handicapped/disabled access
Hendon Central stn entrance.JPG 19 November 1923 Edgware Branch map 15
Brent Cross Brent Cross stn building.JPG 19 November 1923 Edgware Branch Opened as Brent, renamed 20 July 1976map 16

Golders Green Handicapped/disabled access
Golders Green stn building.JPG 22 June 1907 Edgware Branch Originally a terminus, until now it is a terminus for some trainsmap 17
Hampstead Hampstead station building.JPG 22 June 1907 Edgware Branch The name "Heath Street" was originally proposed to name this station as seen on wall tilings on station platform wallsmap 18
Belsize Park Belsize Park stn building.JPG 22 June 1907 Edgware Branch One of eight London Underground stations which have deep-level air-raid shelters underneath them. The shelter was constructed in World War II to provide safe accommodation for service personnel.map 19
Chalk Farm Chalk Farm stn entrance.JPG 22 June 1907 Edgware Branch map 20
Camden Town Camden Town stn building2.JPG 22 June 1907 Main "route" The junctions connecting the two northern branches of the Northern line to the two central branches are just south of Camden Town station. The station has a pair of platforms on each of the two northern branches, and southbound trains can depart toward either Charing Cross or Bank from either of the two southbound platforms without crossing over.map 21
Mornington Crescent Mornington Crescent stn building.JPG 22 June 1907 Charing Cross branch The station was planned to be named "Seymour Street" but was changed to Mornington Crescent. It was closed on 23 October 1992 to replace the lifts and was reopened on 27 April 1998.map 22

Euston London OvergroundNational Rail
Euston station facade.jpg 12 May 1907 Charing Cross/Bank branch Change for Northern line service via Bank or Charing Cross and Victoria linemap 23
Warren Street Warren Street stn entrance.JPG 22 June 1907 Charing Cross branch Change for Victoria linemap 24
Goodge Street Goodge Street stn entrance.JPG 22 June 1907 Charing Cross branch Opened as Tottenham Court Road, renamed 3 September 1908map 25

Tottenham Court Road Handicapped/disabled access
Tottenham Court Road stn main entrance under refurb Oct 09.JPG 30 July 1900 Charing Cross branch Change for Central linemap 26
Leicester Square Leicester Square stn northwest entrance.JPG 15 December 1906 Charing Cross branch Change for Piccadilly line map 27

Charing Cross National Rail
Charing Cross tube station 1.jpg 10 March 1906 Charing Cross branch Northern line platforms opened 22 June 1907, change for Bakerloo linemap 28

Embankment (London River ServicesEmbankment Pier)
Embankment station.jpg 30 May 1870 Charing Cross branch Northern line extension opened 13 September 1926, change for Bakerloo, Circle and District linesmap 29

Waterloo National Rail (London River ServicesWaterloo Pier, Festival Pier)
Waterloo tube stn entrance.JPG 8 August 1898 Charing Cross branch Northern line began 1926, change for Bakerloo, Jubilee and Waterloo & City linesmap 30

King's Cross St. Pancras Handicapped/disabled accessNational Rail (Airport interchangeTrains Gatwick and Luton)
King's Cross St Pancras tube stn Euston Rd NE entrance.JPG 1863 (Northern line May 1907) Bank branch Change for Circle, Hammersmith & City, Metropolitan, Piccadilly and Victoria linesmap 31
Angel Angel station entrance.JPG 1901 Bank branch It has the longest escalator on the entire Underground network. map 32

Old Street National Rail
Old Street stn northwest entrance.JPG November 1901 Bank branch Northern line platforms opened on February 1904map 33

Moorgate National Rail
Moorgate entrance Mgate.JPG 1865 Bank branch Change for Circle line, Hammersmith & City & Metropolitan linesmap 34

Bank Docklands Light Railway
Bank station entrance look to Bank.JPG 25 February 1900 Bank branch Linked with Monument by escalator 18 September 1933, change for Central and Waterloo & City lines.map 35

London Bridge Handicapped/disabled accessNational Rail (Airport interchangeTrains to Gatwick and Luton) (London River ServicesLondon Bridge City Pier) Handicapped/disabled access
London bridge tube station.jpg 25 February 1900 Bank branch Change for Jubilee linemap 36
Borough Borough station building.JPG 18 December 1890 Bank branch map 37

Elephant & Castle National Rail
Elephant & Castle stn south entrance.JPG 18 December 1890 Bank branch Change for Bakerloo linemap 38
Kennington Kennington station building.JPG 18 December 1890 Main route Southbound trains on the Charing Cross branch often terminate here, which has a terminal loop.map 39
Oval Oval station building.JPG 18 December 1890 Main route map 40
Stockwell Stockwell station building.JPG 4 November 1890 Main route Change for Victoria line. Originally a terminus until 1900, when the line was extended to Clapham Common. The station was resited south of the original one. Formerly a depot was present branched off from the current southbound track. It is one of the eight stations that have a deep level air-raid shelter. map 41
Clapham North Clapham North stn entrance.JPG June 1900 Main route One of the two remaining stations to have an island platform underground. It is also one of the eight stations that have a deep level air-raid shelter.map 42
Clapham Common Clapham Common Tube Station Exterior - Oct 2007.jpg June 1900 Main route Original terminus until 1926. It is also one of the two remaining stations to have an island platform underground. It is also one of the eight stations that have a deep level air-raid shelter.map 43
Clapham South ClaphamSouthTube.jpg 13 September 1926 Main route It is one of the eight stations that have a deep level air-raid shelter.map 44

Balham National Rail
Balham station.jpg 6 December 1926 Main route map 45
Tooting Bec Tooting Bec stn west entrance.JPG 13 September 1926 Main route Opened as Trinity Road, renamed 1 October 1950map 46
Tooting Broadway Tooting Broadway stn building.JPG 13 September 1926 Main route Used as a terminus for some trains heading southmap 47
Colliers Wood Colliers Wood stn entrance.JPG 13 September 1926 Main route map 48
South Wimbledon South Wimbledon stn entrance.JPG 13 September 1926 Main route Opened as South Wimbledon (Merton). The suffix gradually fell out of use but still can be seen on some platform signage.map 49

Morden Handicapped/disabled access
Morden Tube Station.jpg 13 September 1926 Main route
Terminusmap 50


Closed stations




Permanently closed stations




  • King William Street (closed 1900, replaced by Bank)


  • City Road (closed 1922)


  • South Kentish Town (closed 1924)


  • North End (also known as Bull & Bush - never opened – work stopped 1906)



Resited stations




  • Stockwell – new platforms resited immediately to the south of its predecessor with the 1922–1924 upgrade of the line.


  • Euston – Northbound City branch platform resited on new alignment parallel to northbound Victoria line, with previous island platform converted to a single platform.


  • Angel – old island platform converted into a single platform, and a new alignment opened in 1992, along with a new entrance.


  • London Bridge – the northbound tunnel and platform converted into a concourse, and a new northbound tunnel and platform built in the late 1990s to increase the platform and circulation areas in preparation for the opening of the Jubilee line.



Abandoned plans


Northern Heights stations not transferred from LNER




  • Highgate – High-level only

  • Stroud Green

  • Crouch End

  • Cranley Gardens

  • Muswell Hill

  • Alexandra Palace

  • Mill Hill (The Hale)


Bushey Extension stations not constructed



  • Brockley Hill

  • Elstree South

  • Bushey Heath



Infrastructure



Rolling stock




A Northern line train arriving at Finchley Central.


When the line opened, it was served by 1906 Stock. These were replaced by 1938 stock as part of the New Works Programme, later supplemented with identical 1949 Stock. When the Piccadilly line was extended to Heathrow Airport in the 1970s, its 1959 Stock and 1956 Stock (prototypes of the 1959 Stock) trains were transferred to the Northern line. As there were not enough 1956 and 1959 Stock trains to replace the Northern line's 1938 Stock fleet, they were supplemented with newly built 1972 Mark 1 Stock trains, which all served the line at the same time. The few 1956 Stock trains were briefly replaced by 1962 Stock transferred from the Central line in 1995, before the entire Northern line fleet was replaced with 1995 Stock between 1997 and 1999.


Today, all Northern line trains consist of 1995 Stock in the Underground livery of red, white and blue. In common with the other deep-level lines, the trains are the smaller of the two loading gauges used on the system. 1995 stock has automated announcements and quick-close doors.[citation needed] If the proposed split of the line takes place (initial estimates of 2018 having been abandoned to focus on completion of the Battersea and Nine Elms extension work), 19 new trains will be added to the existing fleet of 106 trains,[29] though additional trains beyond the extra 19 trains may be required to provide a full service for the new Battersea extension.



Tunnels


Although two other London Underground lines operate fully underground, the Northern line is unusual in that it is a deep-level tube line that serves the outer suburbs of South London yet there is only one station above ground (Morden tube station) while the rest of this part of the line is deep below ground. The short section to Morden depot is also above ground. This is partly because its southern extension into the outer suburbs was not done by taking over an existing surface line as was generally the case with routes like the Central, Jubilee and Piccadilly lines. Apart from the core central underground tunnels, part of the section between Hendon and Colindale is also underground. As bicycles are not allowed in tunnel sections (even if no station is in that section) as they would hinder evacuation, they are limited to High Barnet – East Finchley, the Mill Hill East branch, Edgware – Colindale and Hendon Central – Golders Green.[30] There are also time-based restrictions for the sections where bicycles are allowed.[30]


The tunnel from Morden to East Finchley via Bank, 17 miles 528 yards (27.841 km),[2] was for a time the longest in the world. The Channel Tunnel linking the UK and France together is now longer.



Depots


The Northern line is serviced by four depots. The main one is at Golders Greenmap 51, adjacent to Golders Green tube station, while the second, at Morden,map 52 is south of Morden tube station and is the larger of the two. The other two are at Edgware and Highgate. The Highgate depot is on the former LNER branch to Alexandra Palace. There was originally a depot at Stockwell but it closed in 1915. There are sidings at High Barnet for stabling trains overnight.



Future



Battersea extension



The Northern line is currently being extended to serve the redevelopment of Battersea Power Station. Partially funded by private developers, the £1.2bn[31] project will extend the Charing Cross branch of the line for 3.2 km (2.0 mi) from Kennington to Battersea Power Station, with an intermediate stop at Nine Elms.[32][33] Approved by Wandsworth Council in 2010,[34] and Transport for London in 2014,[32] the construction of the line began in 2015. Tunnelling for the project was completed in 2017, with the extension estimated to open in 2020.[31][33]


Provision will be made for a future onward connection to Clapham Junction railway station by reserving a path running beneath Battersea Park.[35]



Northern line split


TfL has long aspired to split the Northern line into two separate routes.[36][37] Running trains between all combinations of branches and the two central sections, as at present, means only 24 trains an hour can run through each of the central sections at peak times, because merging trains have to wait for each other at the junctions at Camden Town and Kennington.[38] Completely segregating the routes could allow 36 trains an hour on all parts of the line.[38] TfL has already separated the Charing Cross and Bank branches during off-peak periods; however, four trains per hour still run to and from Morden via Charing Cross in the peak, and the Edgware and High Barnet northern branches cannot be separated until Camden Town station is upgraded to cope with the numbers of passengers changing trains.[38]


In 2005 London Underground failed to secure planning permission for a comprehensive upgrade plan for Camden Town tube station that would have involved demolition of the existing station entrance and several other surface-level buildings, all within a conservation area.[39][40] New plans were submitted in 2015, which avoid the existing station entrance and the conservation area by building a second entrance and interchange tunnels to the north, mostly on the site of a subsequently vacated Infant school.[40] If the approval is given, the upgrading work is expected to begin in 2020 and complete in 2024.[41]



In popular culture



  • In his debut novel Ghostwritten, David Mitchell characterises the Northern line as "the psycho of the family".[42]

  • The Bloc Party song "Waiting For the 7.18" references the Northern line as "the loudest".[43]

  • As part of a series of twelve books tied to the twelve lines of the London Underground, A Northern Line Minute focuses on the Northern line.[44]

  • The Nick Drake song "Parasite" references the Northern Line.[45]

  • The 1982 Robyn Hitchcock song "Fifty Two Stations" begins, "There's fifty-two stations on the Northern Line/None of them is yours, one of them is mine."[46]



See also




  • Leslie Green, architect of the Charing Cross, Euston and Hampstead Railway's early stations


  • T. P. Figgis, architect of the City and South London Railway's original stations


  • London deep-level shelters, most of which are under Northern line stations

  • N5 night bus

  • N20 night bus

  • List of crossings of the River Thames

  • List of bridges in London

  • Tunnels underneath the River Thames



Maps





  • ^map 1 High Barnet – 51°39′02″N 000°11′39″W / 51.65056°N 0.19417°W / 51.65056; -0.19417 (01 - High Barnet tube station)


  • ^map 2 Totteridge & Whetstone – 51°37′50″N 000°10′45″W / 51.63056°N 0.17917°W / 51.63056; -0.17917 (02 - Totteridge & Whetstone tube station)


  • ^map 3 Woodside Park – 51°37′05″N 000°11′08″W / 51.61806°N 0.18556°W / 51.61806; -0.18556 (03 - Woodside Park tube station)


  • ^map 4 West Finchley – 51°36′34″N 000°11′18″W / 51.60944°N 0.18833°W / 51.60944; -0.18833 (04 - West Finchley tube station)


  • ^map 5 Mill Hill East – 51°36′30″N 000°12′37″W / 51.60833°N 0.21028°W / 51.60833; -0.21028 (05 - Mill Hill East tube station)


  • ^map 6 Finchley Central – 51°36′04″N 000°11′33″W / 51.60111°N 0.19250°W / 51.60111; -0.19250 (06 - Finchley Central tube station)


  • ^map 7 East Finchley – 51°35′14″N 000°09′54″W / 51.58722°N 0.16500°W / 51.58722; -0.16500 (07 - East Finchley tube station)


  • ^map 8 Highgate – 51°34′40″N 000°08′45″W / 51.57778°N 0.14583°W / 51.57778; -0.14583 (08 - Highgate tube station)


  • ^map 9 Archway – 51°33′56″N 000°08′06″W / 51.56556°N 0.13500°W / 51.56556; -0.13500 (09 - Archway tube station)


  • ^map 10 Tufnell Park – 51°33′24″N 000°08′17″W / 51.55667°N 0.13806°W / 51.55667; -0.13806 (10 - Tufnell Park tube station)


  • ^map 11 Kentish Town – 51°33′01″N 000°08′26″W / 51.55028°N 0.14056°W / 51.55028; -0.14056 (11 - Kentish Town stationq)


  • ^map 12 Edgware – 51°36′50″N 000°16′30″W / 51.61389°N 0.27500°W / 51.61389; -0.27500 (12 - Edgware tube station)


  • ^map 13 Burnt Oak – 51°36′10″N 000°15′50″W / 51.60278°N 0.26389°W / 51.60278; -0.26389 (13 - Burnt Oak tube station)


  • ^map 14 Colindale – 51°35′44″N 000°15′00″W / 51.59556°N 0.25000°W / 51.59556; -0.25000 (14 - Colindale tube station)


  • ^map 15 Hendon Central – 51°34′59″N 000°13′34″W / 51.58306°N 0.22611°W / 51.58306; -0.22611 (15 - Hendon Central tube station)


  • ^map 16 Brent Cross – 51°34′36″N 000°12′49″W / 51.57667°N 0.21361°W / 51.57667; -0.21361 (16 - Brent Cross tube station)


  • ^map 17 Golders Green – 51°34′19″N 000°11′38″W / 51.57194°N 0.19389°W / 51.57194; -0.19389 (17 - Golders Green tube station)


  • ^map 18 Hampstead – 51°33′25″N 000°10′42″W / 51.55694°N 0.17833°W / 51.55694; -0.17833 (18 - Hampstead tube station)


  • ^map 19 Belsize Park – 51°33′01″N 000°09′52″W / 51.55028°N 0.16444°W / 51.55028; -0.16444 (19 - Belsize Park tube station)


  • ^map 20 Chalk Farm – 51°32′39″N 000°09′12″W / 51.54417°N 0.15333°W / 51.54417; -0.15333 (20 - Chalk Farm tube station)


  • ^map 21 Camden Town – 51°32′22″N 000°08′34″W / 51.53944°N 0.14278°W / 51.53944; -0.14278 (21 - Camden Town tube station)


  • ^map 22 Mornington Crescent – 51°32′04″N 000°08′19″W / 51.53444°N 0.13861°W / 51.53444; -0.13861 (22 - Mornington Crescent tube station)


  • ^map 23 Euston – 51°31′42″N 000°07′59″W / 51.52833°N 0.13306°W / 51.52833; -0.13306 (23 - Euston tube station)


  • ^map 24 Warren Street – 51°31′29″N 000°08′18″W / 51.52472°N 0.13833°W / 51.52472; -0.13833 (24 - Warren Street tube station)


  • ^map 25 Goodge Street – 51°31′15″N 000°08′04″W / 51.52083°N 0.13444°W / 51.52083; -0.13444 (25 - Goodge Street tube station)


  • ^map 26 Tottenham Court Road – 51°30′58″N 000°07′51″W / 51.51611°N 0.13083°W / 51.51611; -0.13083 (26 - Tottenham Court Road tube station)


  • ^map 27 Leicester Square – 51°30′41″N 000°07′41″W / 51.51139°N 0.12806°W / 51.51139; -0.12806 (27 - Leicester Square tube station)


  • ^map 28 Charing Cross – 51°30′29″N 000°07′29″W / 51.50806°N 0.12472°W / 51.50806; -0.12472 (28 - Charing Cross tube station)


  • ^map 29 Embankment – 51°30′25″N 000°07′19″W / 51.50694°N 0.12194°W / 51.50694; -0.12194 (29 - Embankment tube station)


  • ^map 30 Waterloo – 51°30′09″N 000°06′47″W / 51.50250°N 0.11306°W / 51.50250; -0.11306 (30 - Waterloo tube station)


  • ^map 31 King's Cross St. Pancras – 51°31′49″N 000°07′27″W / 51.53028°N 0.12417°W / 51.53028; -0.12417 (31 - King's Cross St. Pancras tube station)


  • ^map 32 Angel – 51°31′55″N 000°06′22″W / 51.53194°N 0.10611°W / 51.53194; -0.10611 (32 - Angel tube station)


  • ^map 33 Old Street – 51°31′33″N 000°05′14″W / 51.52583°N 0.08722°W / 51.52583; -0.08722 (33 - Old Street station)


  • ^map 34 Moorgate – 51°31′07″N 000°05′19″W / 51.51861°N 0.08861°W / 51.51861; -0.08861 (34 - Moorgate station)


  • ^map 35 Bank-Monument – 51°30′47″N 000°05′17″W / 51.51306°N 0.08806°W / 51.51306; -0.08806 (35 - Bank–Monument station)


  • ^map 36 London Bridge – 51°30′18″N 000°05′10″W / 51.50500°N 0.08611°W / 51.50500; -0.08611 (36 - London Bridge station)


  • ^map 37 Borough – 51°30′04″N 000°05′35″W / 51.50111°N 0.09306°W / 51.50111; -0.09306 (37 - Borough tube station)


  • ^map 38 Elephant & Castle – 51°29′40″N 000°05′59″W / 51.49444°N 0.09972°W / 51.49444; -0.09972 (38 - Elephant & Castle tube station)


  • ^map 39 Kennington – 51°29′19″N 000°06′20″W / 51.48861°N 0.10556°W / 51.48861; -0.10556 (39 - Kennington tube station)


  • ^map 40 Oval – 51°28′55″N 000°06′45″W / 51.48194°N 0.11250°W / 51.48194; -0.11250 (40 - Oval tube station)


  • ^map 41 Stockwell – 51°28′21″N 000°07′20″W / 51.47250°N 0.12222°W / 51.47250; -0.12222 (41 - Stockwell tube station)


  • ^map 42 Clapham North – 51°27′54″N 000°07′48″W / 51.46500°N 0.13000°W / 51.46500; -0.13000 (42 - Clapham North tube station)


  • ^map 43 Clapham Common – 51°27′42″N 000°08′19″W / 51.46167°N 0.13861°W / 51.46167; -0.13861 (43 - Clapham Common tube station)


  • ^map 44 Clapham South – 51°27′10″N 000°08′51″W / 51.45278°N 0.14750°W / 51.45278; -0.14750 (44 - Clapham South tube station)


  • ^map 45 Balham – 51°26′33″N 000°09′07″W / 51.44250°N 0.15194°W / 51.44250; -0.15194 (45 - Balham station)


  • ^map 46 Tooting Bec – 51°26′09″N 000°09′35″W / 51.43583°N 0.15972°W / 51.43583; -0.15972 (46 - Tooting Bec tube station)


  • ^map 47 Tooting Broadway – 51°25′40″N 000°10′06″W / 51.42778°N 0.16833°W / 51.42778; -0.16833 (47 - Tooting Broadway tube station)


  • ^map 48 Colliers Wood – 51°25′06″N 000°10′42″W / 51.41833°N 0.17833°W / 51.41833; -0.17833 (48 - Colliers Wood tube station)


  • ^map 49 South Wimbledon – 51°24′56″N 000°11′31″W / 51.41556°N 0.19194°W / 51.41556; -0.19194 (49 - South Wimbledon tube station)


  • ^map 50 Morden – 51°24′08″N 000°11′42″W / 51.40222°N 0.19500°W / 51.40222; -0.19500 (50 - Morden tube station)


  • ^map 51 Golders Green depot – 51°34′22″N 000°11′35″W / 51.57278°N 0.19306°W / 51.57278; -0.19306 (51 - Golders Green depot)


  • ^map 52 Morden depot – 51°23′51″N 000°11′49″W / 51.39750°N 0.19694°W / 51.39750; -0.19694 (52 - Morden depot)







Map all coordinates using: OpenStreetMap 

Download coordinates as: KML · GPX


References



Notes





  1. ^ A "tube" railway is an underground railway constructed in a cylindrical tunnel by the use of a tunnelling shield, usually deep below ground level.


  2. ^ The seven companies were 1. the City & South London Railway, 2. the Charing Cross, Euston & Hampstead Railway, 3. the Edgware, Highgate & London Railway, 4. the Edgware & Hampstead Railway, 5. the Watford & Edgware Railway, 6. The Wimbledon & Sutton Railway and 7. the Great Northern & City Railway.


  3. ^ The stations that the C&SLR were to serve on the W&SR, would not have included all those subsequently built by the Southern Railway. South Morden (not built), Sutton Common, Cheam (not built) and Sutton, would have been served, but Morden South, St Helier and West Sutton were not part of the UERL's plan.




Citations





  1. ^ "LU Performance Data Almanac". Transport for London. 2011–2012. Archived from the original on 3 August 2012. Retrieved 1 August 2012..mw-parser-output cite.citation{font-style:inherit}.mw-parser-output q{quotes:"""""""'""'"}.mw-parser-output code.cs1-code{color:inherit;background:inherit;border:inherit;padding:inherit}.mw-parser-output .cs1-lock-free a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/6/65/Lock-green.svg/9px-Lock-green.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .cs1-lock-limited a,.mw-parser-output .cs1-lock-registration a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/d/d6/Lock-gray-alt-2.svg/9px-Lock-gray-alt-2.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .cs1-lock-subscription a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/a/aa/Lock-red-alt-2.svg/9px-Lock-red-alt-2.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration{color:#555}.mw-parser-output .cs1-subscription span,.mw-parser-output .cs1-registration span{border-bottom:1px dotted;cursor:help}.mw-parser-output .cs1-hidden-error{display:none;font-size:100%}.mw-parser-output .cs1-visible-error{font-size:100%}.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration,.mw-parser-output .cs1-format{font-size:95%}.mw-parser-output .cs1-kern-left,.mw-parser-output .cs1-kern-wl-left{padding-left:0.2em}.mw-parser-output .cs1-kern-right,.mw-parser-output .cs1-kern-wl-right{padding-right:0.2em}


  2. ^ ab "Northern line facts". Transport for London. n.d. Retrieved 12 March 2012.


  3. ^ ab Smith, Rebecca (29 January 2018). "Northern Line passengers to get quicker and more frequent journeys as TfL boosts services to tackle crowding on busiest Tube line". City AM. London. Archived from the original on 30 January 2018. Retrieved 29 January 2018.


  4. ^ "No. 28665". The London Gazette. 22 November 1912. p. 8798.


  5. ^ "No. 27380". The London Gazette. 26 November 1901. p. 8200.


  6. ^ "No. 32770". The London Gazette. 24 November 1922. pp. 8314–8315.


  7. ^ "Underground Journeys: Moving Underground". www.architecture.com. Royal Institute of British Architects. Archived from the original on 4 May 2011. Retrieved 20 February 2011.


  8. ^ "Underground Journeys: South Wimbledon". www.architecture.com. Royal Institute of British Architects. Archived from the original on 7 July 2011. Retrieved 20 February 2011.


  9. ^ Wolmar 2004, "Reaching Out", p. 225.


  10. ^ Robert Graves and Alan Hodge, "The Long Weekend," p. 192
    ISBN 0393311368



  11. ^ Rails through the Clay; Croome & Jackson; London; 2nd ed; 1993; p228


  12. ^ "London Tubes' New Names – Northern and Central Lines". The Times (47772): 12. 25 August 1937. Retrieved 18 May 2009.
    (subscription required)



  13. ^ Beard 2002, pp. 90–92.


  14. ^ "Call for action on Northern Line". BBC News. 12 October 2005. Retrieved 10 June 2008.


  15. ^ Stebbings, Peter (11 September 2006). "Five more years of Northern line pain". This Is Local London. Archived from the original on 4 June 2011. Retrieved 26 August 2008.


  16. ^ "Travel Delays as Tube Line Shut". BBC News. London. 13 October 2005. Retrieved 30 June 2008.


  17. ^ "No Service on the Northern Line" (Press release). Transport for London. 13 October 2005. Retrieved 30 June 2008.


  18. ^ "Map of Upgrades" (PDF). Tube Lines. Archived from the original (PDF) on 6 April 2008. Retrieved 30 June 2008.


  19. ^ "Runaway train on London Tube's Northern Line". BBC News. 13 August 2010. Retrieved 18 August 2010.


  20. ^ Runaway of an engineering train from Highgate 13 August 2010 (Technical report). RAIB. 2011. 09-2011.


  21. ^ Gareth Corfield (9 August 2016). "London's 'automatic' Tube trains suffered 750 computer failures last year". The Register. Retrieved 9 August 2016.


  22. ^ "Network Tests for New Signalling Systems" (Press release). Tube Lines. 24 August 2005. Archived from the original on 5 January 2008.


  23. ^ "Operational and Financial Performance Report and Investment Programme Report – Third Quarter, 2012/13" (PDF). Transport for London. 6 February 2013.


  24. ^ "Northern line upgrade one step closer" (Press release). Transport for London. 26 February 2013.


  25. ^ ab "The Night Tube". Transport for London. Retrieved 2016-09-28.


  26. ^ "The Night Tube". Transport for London. n.d.


  27. ^ Topham, Gwyn (27 August 2015). "London night tube plan suspended". The Guardian. London.


  28. ^ ab "Twin Peaks: Timetable Changes on the Northern Line". London Reconnections.


  29. ^ Abbot 2010, pp. 57–58.


  30. ^ ab "Bicycle on Tube map" (PDF). Transport for London. June 2013. Retrieved 5 April 2015.


  31. ^ ab "Tunnelling work to extend Tube's Northern Line to Battersea completed". Evening Standard. Retrieved 2018-01-22.


  32. ^ ab Matters, Transport for London | Every Journey. "Northern line extension to Battersea gets go-ahead". Transport for London. Retrieved 2018-01-22.


  33. ^ ab Matters, Transport for London | Every Journey. "Northern line extension". Transport for London. Retrieved 2018-01-22.


  34. ^ "Battersea Power Station scheme approved" (Press release). London Borough of Wandsworth. 11 November 2010. Retrieved 12 November 2010.


  35. ^ Henderson, Jamie (23 June 2013). "Clapham Junction next for Northern Line says London Assembly member". Wandsworth Guardian. Retrieved 12 January 2014.


  36. ^ "Transport 2025 – Transport Vision for a Growing World" (PDF). Transport for London. 11 November 2006. Archived from the original (PDF) on 15 July 2011. Retrieved 21 July 2008.


  37. ^ Lydall, Ross (12 May 2010). "Northern line service divided in £312m bid to end overcrowding". London Evening Standard. Retrieved 21 March 2013.


  38. ^ abc "Twin Peaks: Timetable Changes on the Northern Line". London Reconnections. 14 January 2015.


  39. ^ "Camden Town Redevelopment". Alwaystouchout.com. 25 January 2006. Retrieved 30 June 2008.


  40. ^ ab Bull, John (14 October 2015). "Second Time Lucky: Rebuilding Camden Town Station". London Reconnections.


  41. ^ "TfL Camden Station Consultation" (PDF). Transport for London. p. 10.


  42. ^ TJ Dawe. "Literary Excerpt: David Mitchell and the Character of the London Underground Lines".


  43. ^ "BlocParty.net - Waiting For The 7.18". Archived from the original on 15 April 2013.


  44. ^ "A Northern Line Minute, The Northern Line by William Leith". Penguin Books Limited. Retrieved August 28, 2017.


  45. ^ "Parasite".


  46. ^ "Fifty Two Stations".




Bibliography


.mw-parser-output .refbegin{font-size:90%;margin-bottom:0.5em}.mw-parser-output .refbegin-hanging-indents>ul{list-style-type:none;margin-left:0}.mw-parser-output .refbegin-hanging-indents>ul>li,.mw-parser-output .refbegin-hanging-indents>dl>dd{margin-left:0;padding-left:3.2em;text-indent:-3.2em;list-style:none}.mw-parser-output .refbegin-100{font-size:100%}



  • Abbott, James (February 2010). "Northern Line split planned". Modern Railways. Hersham: Ian Allan. 67 (737). ISSN 0026-8356.


  • Beard, Tony (2002). By Tube Beyond Edgware. Capital Transport. ISBN 978-1-85414-246-7.


  • Blake, Jim; James, Jonathan (1993). Northern Wastes: Scandal of the Uncompleted Northern Line. London: North London Transport Society. ISBN 0-946383-04-9.


  • Demuth, Tim (2004). The Spread of London's Underground (2 ed.). London: Capital Transport Publishing. ISBN 1-85414-277-1.


  • Horne, Mike (1987). Northern Line: A Short History. London: Douglas Rose. ISBN 1-870354-00-1.


  • Horne, Mike; Bayman, Bob (2009). The Northern Line: An Illustrated History (3 ed.). London: Capital Transport Publishing. ISBN 1-85414-326-3.


  • Lee, Charles Edward (1973). Northern Line. London: London Transport. ISBN 0-85329-044-X.


  • Lee, Charles Edward (1967). Sixty Years of the Northern. London: London Transport. OCLC 505166556.


  • Lee, Charles Edward (1957). Fifty Years of the Hampstead Tube. London: London Transport. OCLC 23376254.


  • Murphy, Simon (2005). Northern Line Extensions: Golders Green to Edgware, 1922–24. London: The History Press. ISBN 0-7524-3498-5.


  • Wolmar, Christian (2004). The Subterranean Railway: How the London Underground Was Built and How It Changed the City Forever. London: Atlantic Books. ISBN 1-84354-023-1.




External links






Route map:






Template:Attached KML/Northern line

KML is from Wikidata



  • "Northern Line". Clive's Underground Line Guides. 7 February 2008. Retrieved 11 July 2008.


  • Northern line Route for the freeware train simulator BVE Trainsim


  • "Northern Heights". Underground History. 23 February 2005. Retrieved 11 July 2008.


  • Above-ground route of line from Morden to Edgware, constructed from Google StreetView


  • Architectural history of London Underground during 1920-30s from the Royal Institute of British Architects

    • Old Street, Angel and Stockwell stations

    • South Clapham, Tooting Bec and South Wimbledon




  • Northern line on Twitter Edit this at Wikidata










Popular posts from this blog

Y

Mount Tamalpais

Indian Forest Service